Illustration: a large basement egress window with a stepped stone window well, seen from outside
  1. Home
  2. Blog
  3. Codes and Permits

Basement Egress Windows: Sizes, Wells and Permits

Every basement bedroom needs an emergency escape and rescue opening, usually an egress window with a window well outside it. The rules are specific, and the windows most builders install in unfinished basements rarely meet them. If a bedroom is on your list, the egress window is the first thing to plan.

The measurements

Under the International Residential Code, which most Front Range jurisdictions adopt in some edition, an emergency escape opening needs:

  • At least 5.7 square feet of net clear opening. That is the area you can actually climb through with the window fully open, not the size of the glass. Openings at grade floor can be 5.0 square feet.
  • At least 24 inches of clear height and 20 inches of clear width.
  • A sill no higher than 44 inches above the finished floor.
  • Operation from inside without keys, tools or special knowledge.

Meeting the minimum height and minimum width at the same time does not meet the area requirement: 24 by 20 inches is only about 3.3 square feet. You need more of one or both.

Which window types work

The window type decides how much of the frame actually opens, which is why two windows with the same outside size can give very different clear openings.

Window typeHow it opensEgress notes
CasementSwings out on a side hingeNearly the whole frame opens, so it reaches the required area in a smaller rough opening. Needs room in the well to swing.
Horizontal sliderOne sash slides sidewaysOnly about half the frame opens, so the window must be much wider to meet the area.
Single or double hungSash slides upHalf the frame opens, and the tall size it needs can push the sill height up.
Egress doorA door to a walkout or areawayWorks where the site allows; usually a bigger exterior project.

Window wells

Most basement windows sit below grade, so the opening needs a well that gives someone room to climb out. Under the IRC, a well needs at least 9 square feet of horizontal area, with at least 36 inches of width and of projection out from the wall. If the well is deeper than 44 inches, it needs a permanently attached ladder or steps.

  • Steel or composite liners are common and quick to install.
  • Stepped stone or block wells act as their own steps and can look like part of the landscape.
  • Drainage at the bottom matters as much as size: gravel and a path for water to leave, so the well does not become a bucket against the foundation.
  • Covers keep out snow, leaves and animals, but must be openable from inside without tools.

Cutting a new opening

When the existing window is too small, the usual fix is to enlarge the opening in the foundation wall. That is structural work on the foundation, which means it needs a permit, and sometimes an engineer's input on the header or lintel above the new opening.

The sequence is predictable: excavate outside, cut the concrete, install the header if required, set the window, install the well and drainage, backfill, then finish the interior around it. Doing it before the ground freezes is much easier than doing it in January.

Permit paths vary along the corridor. In Colorado Springs, for example, basement work is permitted through the regional building department, and our basement finishing in Colorado Springs page explains how that office handles a basement finish.

Common mistakes

Measuring the glass instead of the opening
Only the clear opening counts. Sashes, frames and hardware reduce it.
Forgetting the sill height
A big window set high in the wall can still fail at 44 inches. Steps or a platform inside are not a substitute unless your jurisdiction allows them.
A well too small for a casement
The sash needs room to swing fully open inside the well.
Calling a room a bedroom without one
A room without a compliant opening can be an office or a den, not a bedroom, for safety and for resale.

Older finished basements

Many older basement "bedrooms" were finished without a compliant opening. If you are reworking one, adding egress is often the most valuable change in the project, and it pairs naturally with the other upgrades covered on our basement remodeling page.

For a new finish, egress is one of the first decisions in the plan, alongside ceiling height and the bathroom location. Our basement finishing guide covers how those choices shape the layout.

Published by Basement Finishing Parker CO. A basement finishing and remodeling company based in Parker, Colorado, working along the Front Range from Colorado Springs to Fort Collins. About the company.

Planning a basement project?

Tell us what the space needs to do, and we will take it from there.

Start Your Project